DAMMAM · 2ND INDUSTRIAL CITY · الدمام · المدينة الصناعية الثانية YARD OPEN SUN–FRI 06:00–19:00 +966 56 978 9151 · WHATSAPP

SECTOR 04 · PROJECTS · EASTERN PROVINCE · المشاريع

Every demolition is a delivery.

Decommissioning, strip-outs and site clearances where the metal we recover pays part of your bill. Scoped on site, priced as one written package, and documented to the tonne.

01Scope in writingBEFORE THE FIRST TRUCK ROLLS02Recovered value creditedTHE METAL PAYS PART OF YOUR BILL03Everyone goes homePERMITS AND PPE, EVERY SITE04Delivered to the date namedSCHEDULES WE SIGN, NOT SUGGEST

HOW THE NUMBER WORKS · كيف يُحسب السعر

PROJECT COSTCutting, clearing, haulage
RECOVERED VALUEMetal weighed and credited
=
YOUR BILLOne written package

The metal in a structure pays for part of its own removal. The credit is on the quote before the first truck rolls.

ModelRecovery offsets cost
ScopeWritten, fixed price
SafetyPermits, PPE, toolbox talks
RecordsEvery tonne on paper
№ 01

Three promises, before the first truck rolls.

ثلاثة وعود
01

Scope in writing

A walk-through with our estimator produces one written package: scope, schedule, price and the recovery credit that reduces it.

CHECK ITThe credit is on the quote, not discovered later.

02

Recovered value credited

Every outbound truck crosses a certified scale on the way to our own yard, and the recovered value is credited on your quote.

CHECK ITA weigh ticket for every load, photographed at the scale.

03

Delivered to the date named

Schedules agreed around your shutdown window and signed, not suggested. Method statements and permits before work starts, PPE and toolbox talks on every site.

CHECK ITClose-out is a bill of materials matched to tickets, and one final statement.

№ 03

The project arc.

مسار المشروع
STEP 01

Walk the site, write the number

An estimator walks the site with you and returns one written package. You hold: scope, schedule, fixed price and the credit, on one page.

STEP 02

Cut, clear, load out

Our crews cut, sort and load under the method statement, and every truck is weighed before it leaves. You hold: a weigh ticket for every load.

STEP 03

Close out on paper

You end the project holding the full record: bill of materials for every tonne removed, weigh tickets matched to it, and the final settlement. No surprises.

An industrial plant at sunrise
EASTERN PROVINCEPlants, yards and sites across Dammam, Khobar, Dhahran and Jubail, scoped on site and priced in writing.
№ 04

What you hold at close-out.

ما تحصل عليه عند الإقفال

The full record of the job, matched ticket by ticket.

DOCUMENT 01

The written package

The whole job on one page before work starts: what, when, how much, and the credit.

DOCUMENT 02

The weigh tickets

Every outbound load over a certified scale, photographed, one ticket per truck.

DOCUMENT 03

The bill of materials and settlement

Every tonne removed, matched to its tickets, and one final statement.

№ 05

Talk to us.

تواصل معنا
COVERAGEEastern Province
Dammam, Khobar, Dhahran, Jubail
Scoped on site, priced in writing.
THE YARDEvery load ends at
our own yard in Dammam
See the recycling yard →
SAFETYPermits, PPE,
toolbox talks
Method statements before work starts.
№ 06

Bring us the building.

أحضر لنا المبنى

What the wrecking ball starts, we finish, and account for.

Workshops, warehouses, plant areas, full structures. If it holds metal, the project can pay for part of itself.